Date jump to next day automatically in COOIS variant

时间:2014-08-13 17:41:17      阅读:348      评论:0      收藏:0      [点我收藏+]

Q: I have one question about how to get the clocking data from COOIS every day , because we need to check and monitor the clocking for more accuracy .  Then my question is that how can make the actual finish date jump to next day automatically when I setup the scheduling job in the background .

bubuko.com,布布扣

A:

For COOIS you need to choose list “Operations” and you can create a layout variant (i.e.- /DIV8OPST). For “the actual finish date jump to next day automatically when I setup” I hope I understand your question……..You can create a variant for your selection screen and create a dynamic date in the variant:

  1. Enter your selection criteria.
  2. Click on the Save button.
  3. In the variant attributes enter a name and description……..You can protect your variant.
  4. You can also protect fields.
  5. For dynamic dates it can only be applied to date fields:
    1. For column “Selection variable” select from drop down list D = Dynamic date calculation”.
    2. For column “Name of variable” select from drop down list
    3. While in popup enter values -xxx for past days from current and +YYY for future days.
    4. Save variant.

 

bubuko.com,布布扣

Try it a couple of times to see if the dates come in correctly for the date field you want to select.

 

bubuko.com,布布扣

 

***Note: For making sure that data is confirmed correctly it is good to work with work center work list and see if there are operations open in the past and act on them real time. Also it is good to use ZMR048 to review how they did STD vs. actual for operations fully confirmed.

 

Date jump to next day automatically in COOIS variant,布布扣,bubuko.com

Date jump to next day automatically in COOIS variant

原文:http://www.cnblogs.com/jefflu2012/p/3910061.html

(0)
(0)
   
举报
评论 一句话评论(0
关于我们 - 联系我们 - 留言反馈 - 联系我们:wmxa8@hotmail.com
© 2014 bubuko.com 版权所有
打开技术之扣,分享程序人生!